ALL EZY BUILD PRICES EXCLUDE LAND & COUNCIL FEES & GST
1 Bedroom (35 Square Meters) $ 79,900.00 |
- Fully Built +$ 30,000.00
- Weather-tight Shell +$ 9,000.00
- Kit-Set
1 Bedroom Plus (43 Square Meters)
$ 89,900.00
- Fully Built +$ 30,000.00
- Weather-tight Shell +$ 9,000.00
- Kit-Set
2 Bedroom (60 Square Meters)
$ 109,900.00
- Fully Built +$ 35,000.00
- Weather-tight Shell +$ 7,000.00
- Kit-Set
3 Bedroom (72 Square Meters)
$ 129,900.00
- Fully Built +$ 35,000.00
- Weather-tight Shell +$ 12,000.00
- Kit-Set
3 Bedroom (95 Square Meters)
$ 144,900.00
- Fully Built +$ 40,000.00
- Weather-tight Shell +$ 15,000.00
- Kit-Set
3 Bedroom (121 Square Meters)
$ 174,900.00
- Fully Built +$ 46,000.00
- Weather-tight Shell +$ 16,000.00
- Kit-Set
4 Bedroom (138 Square Meters)
$ 197,900.00
- Fully Built +$ 49,000.00
- Weather-tight Shell +$ 15,000.00
- Kit-Set
4 Bedroom (156 Square Meters)
$ 218,900.00
- Fully Built +$ 49,000.00
- Weather-tight Shell +$ 15,000.00
- Kit-Set
5 Bedroom (156 Square Meters)
$ 208,900.00
The Building Process
From A-Z
1 - Identify
- Where is the section that you want to build on?
- Get Lot & DP number.
- Ask your council for these if you don't have them
2 - House Type
- Which Home Plan do you want?
- Decide on the available variations
3 - Who will build it?
- You? (you will need Form 2B - Declaration of Self Build - for your council.)
- A local builder?
- One of our approved assemblers?
- If one of our assemblers, then “Shell Only” or “Full Build”?
4 - Talk to your council
- Talk about putting a house there.
They may talk about:
- Building Consent
- Boundary distances,
- Recession planes (how high the house is in relation to boundaries), and
- “Set-Back” distances,
- Outdoor Living areas etc.
- If your house doesn’t comply with these, then you may need to get “Resource Consent”.
- This is not a daunting as it sounds, and you can often do it yourself.
- Find out if they need a “Geo-technical Report” (A report on the quality of the ground under your house.)
5 - Ancillary work
- Get pricing for these sevices, such as drains, water, power connections, and also get their lead times.
6 - Budgeting
- Seriously.
- Make sure you can get finance.
7 - Geo-technical Report
- Get it done if required by council.
8 - Dates
- Get an approximate delivery date / lead time from us.
- Send us a copy of the Geo-technical report if your council required it.
9 - Sign Contract
- Sign on the dotted line with us!
- Pay 15% deposit.
- We will then send you plans and specification for council.
- We will also do any extra design work at this stage for ground conditions if required
(slope, geo-tech, etc)
- Extra design work is chargeable
10 - Prepare Consent
- You prepare and submit building consent, and possibly Resource Consent if required.
- Council have 10 working days to approve one of our standard houses.
- If you need alterations for foundations, then they have 20 days.
11 - Manufacture
- We will start to manufacture your kit-set.
12 - Final Payment & Inspection
- When kit-set is manufactured, pay remaining money due.
- You may come to visit and put your own padlock on your 40’ container if you want.
- The whole lot is then yours!
13 - Shipped & Start Building
- Container is shipped to site and you may start building